Skip to content
Renovated bathroom with freestanding tub and wood slat wall

Bathroom Renovation

A Bath That Sets Mornings Up Well

Fresh fittings, wipe-clean finishes, and fully sealed tiling — a quieter, comfier routine in as little as a fortnight.

What the Service Includes

Sealed Tight, Well Lit, Simple to Wipe Down

Behind each handsome bath sits tanking you'll never notice. We rebuild showers over sealed boards, tune fittings for genuine pressure, and fit extraction that truly shifts steam — then dress the room in tile, basins, and lights matched to your space and spend.

  • Walk-in showers & tub swaps
  • Waterproof tile systems
  • Vanities & storage niches
  • Heated floors & towel rails
  • Ventilation & lighting
  • Grab bars & aging-in-place
Modern bathroom with freestanding tub and dark tile

Bathroom Process

A Fortnight or Three, Handled End to End

Step 1

Design & Fixtures

Choose tile, vanity, and fixtures from curated options that fit your plumbing layout.

Step 2

Strip & Waterproof

Down to studs, then sealed shower systems and inspected rough plumbing.

Step 3

Tile & Set

Precision tile, grout, glass, vanity, toilet, and lighting — sealed and tested.

Step 4

Detail & Handover

Caulk lines, paint, and a water-test walkthrough before final clean.

Bathroom vanity with round mirror and wall-mounted tap Bright bathroom with tub, glass shower and double vanity
Portrait of Daniel Brooks
“We wanted a bathroom that felt modern but still practical. The team listened carefully, gave honest suggestions, and delivered clean work that fits our family perfectly.”
Daniel Brooks — Bathroom Renovation Client

Bathroom FAQs

Bathroom Questions, Answered

Most complete baths need 2–3 weeks. Stages are ordered so the WC returns first, and single-bath homes get a quickened programme with weekend working.

It depends on your household. Walk-in showers suit daily comfort and accessibility; a tub matters for young families and resale. We lay out both options with honest pros and costs.

Fully sealed waterproofing behind all wet-area tile, sloped shower pans, correctly sized extraction, and mold-resistant boards — all photographed for your records before tiling.